CURRENT STOCKED BUILDING PACKAGE SPECIALS:


Millennium Building Systems is currently carrying too much building stock!!! We have enough pre-engineered structural steel to construct over 20,000 sq.ft. of building and it has to go!!

OPTION RETRO- 1: 60' X 130' X 12' 0" BUTLER PRE-ENGINEERED BUILDING C/W

(5) Intermediate Straight Leg Tapered Beam Frame Assemblies
(2) Post & Beam Endwall Assemblies
(6) Bays 22', 1/12 Gabled Roof Slope

ROOF SYSTEM: (Total R Value of R33)
New 26 GA Galvalume Roof Panel
RECYCYCLED R30 X 4" Urethane Composite Insulation Panel
NEW Riser Clip and Sub-Purlin Assembly
Vapor Barrier & 1" Fibreglass Insulation
26 Gauge Recycled Roof Liner
8" Purlins 60" on center

WALL SYSTEM: ( Total R-Value of R21)
Butler R7 Architectural Mono-Panel Wall System
NEW Horizontal Subgirt
Recycled R15 Urethane Composite Insulation Panel
New 6mil Poly Vapor Barrier
Recycled Interior Full Height 26 Gauge Wall Liner
NEW: Gutter & Downspouts

(3) Recycled 3x7 mandoors with hardware
Engineering for Foundation & Structural (*some conditions may apply)

Erection in Edmonton region

TOTAL COST: $105,265 + GST

NOTE: Concrete, Site Work, Overhead Doors, Permit Costs, not included.

 
FOR MORE INFORMATION ABOUT RETROMAX* BUILDINGS CLICK HERE!    

OPTION RETRO- 2: 60' X 66' X 12' 0" BUTLER PRE-ENGINEERED BUILDING C/W

(5) Intermediate Straight Leg Tapered Beam Frame Assemblies
(2) Post & Beam Endwall Assemblies
(6) Bays 22', 1/12 Gabled Roof Slope

ROOF SYSTEM: (Total R Value of R33)
New 26 GA Galvalume Roof Panel
RECYCYCLED R30 X 4" Urethane Composite Insulation Panel
NEW Riser Clip and Sub-Purlin Assembly
Vapor Barrier & 1" Fibreglass Insulation
26 Gauge Recycled Roof Liner
8" Purlins 60" on center

WALL SYSTEM: ( Total R-Value of R21)
Butler R7 Architectural Mono-Panel Wall System
NEW Horizontal Subgirt
Recycled R15 Urethane Composite Insulation Panel
New 6mil Poly Vapor Barrier
Recycled Interior Full Height 26 Gauge Wall Liner
NEW: Gutter & Downspouts

(3) Recycled 3x7 mandoors with hardware
Engineering for Foundation & Structural (*some conditions may apply)

Erection in Edmonton region

TOTAL COST: $57,985 + GST

NOTE: Concrete, Site Work, Overhead Doors, Permit Costs, not included.

 

 
     
     

 


All contents © Millenium Building Systems™ 2001
 Hosted by Mediashaker